PR24 Status: Accepted FD (Dec 2024) — Technical correction issued Mar 2026
Recent Updates
- Cappagh Appointed — £136.5m Infrastructure & Smart Metering Framework (Aug 2025) — Portsmouth Water awarded two AMP8 contracts to Cappagh, commencing August 2025, covering infrastructure works (asset installation and upgrades) and smart water meter installation across the supply area. The combined contracts are expected to be worth £136.5m and cover AMP8 and into AMP9.
- £170m MEICA Engineering Services Framework Awarded (2025) — Portsmouth Water awarded its Non-Infrastructure (MEICA — Mechanical, Electrical, Instrumentation, Control and Automation) engineering services framework for AMP8 and AMP9, worth £170m combined. The framework was awarded to two Delivery Partners: Bridges Electrical Engineers Ltd and Integrated Water Services Limited.
- Largest-Ever Environmental Study Launched — £4m River Catchment Programme (2025) — Portsmouth Water launched a £4m environmental study — the company's largest-ever — across its river catchments in Hampshire and West Sussex to inform AMP8 environmental commitments and abstraction management.
- Ofwat Technical Correction to PR24 Performance Commitments (Mar 2026) — Ofwat intervened to amend Portsmouth Water's AMP8 performance commitment levels to ensure consistency with its regulatory methodology following a technical inconsistency in the Final Determination.
Key Facts
- Serves approximately 300,000 households across Hampshire and West Sussex — over 160 years of continuous supply
- Water-only company — no sewerage responsibility; wastewater in the area is managed by Southern Water
- Independent — not part of any larger utility group
- Accepted Ofwat PR24 Final Determination, December 2024; Ofwat issued a technical correction to performance commitments in March 2026
- AMP8 investment programme is 150% larger than AMP7 — largest capital programme in the company's history
- Headquarters: Havant, Hampshire
- Regulated by Ofwat, Drinking Water Inspectorate (DWI) and Environment Agency
- Post-reservoir, Portsmouth Water will share resources with Southern Water, improving supply resilience across wider Hampshire
AMP8 Investment Programme — Key Priorities
Portsmouth Water's AMP8 programme is defined by three major workstreams: the Havant Thicket Reservoir (the defining infrastructure project), an infrastructure maintenance and smart metering programme, and an MEICA (above-ground assets) engineering programme. Together these represent the most significant capital investment programme in the company's history.
- Havant Thicket Reservoir (£325m) — New strategic reservoir storing 8.7 billion litres of spring water; located in the centre of Portsmouth Water's supply area near Havant; construction started, due for completion 2029. Once operational, it will be the largest new reservoir built in England since Rutland Water. Surplus resources will be shared with Southern Water customers in Hampshire.
- Infrastructure works — Cappagh framework (£136.5m AMP8/AMP9) — Covering asset installation, upgrades and smart water meter installation across the supply area; commenced August 2025
- MEICA engineering services — Bridges Electrical Engineers & Integrated Water Services (£170m AMP8/AMP9) — Non-infrastructure above-ground assets across the supply area; mechanical, electrical, instrumentation, control and automation
- Smart metering rollout — Advanced Metering Infrastructure rollout across the supply area as part of the Cappagh framework; demand management and leakage detection
- Leakage reduction — Sustained leakage targets; active leakage control, acoustic logging and pressure zone management across the network
- Water quality — Treatment works investment and catchment management; groundwater source protection in the chalk aquifer of the South Downs
- Environmental catchment management — £4m river catchment study informing abstraction sustainability; protection of chalk streams and groundwater-fed rivers in Hampshire and West Sussex
- Network resilience — Trunk main and distribution network investment; improved interconnection across the supply area to reduce single-point-of-failure risk
Havant Thicket Reservoir — The Defining AMP8 Project
The £325m Havant Thicket Reservoir is one of the most significant water infrastructure projects in England in a generation. It will store 8.7 billion litres of spring water that would otherwise be lost to the sea each winter, providing multi-decade supply security for Hampshire and West Sussex. The reservoir will also allow Portsmouth Water to transfer surplus resources to Southern Water customers further west, improving regional resilience across the south coast. Earthworks, lining, civil engineering, M&E fit-out and environmental mitigation are all active sub-supply chain requirements throughout the construction period.
Confirmed Framework Appointments
Our list of Portsmouth Water’s frameworks and the firms named on them, with a link to the published source for every entry, is on its own page:
Portsmouth Water AMP8 contractors: frameworks and named firms, with sources →
🔒 Named supplier contacts, Havant Thicket sub-contract pipeline, procurement calendar and active supply chain opportunities — available with Silver Package
Unlock Full Intelligence →
How to Find Portsmouth Water Tenders
Portsmouth Water publishes procurement opportunities on Find a Tender (find-tender.service.gov.uk) for all above-threshold contracts, including the Havant Thicket Reservoir construction packages. Portsmouth Water also maintains its own supplier portal and procurement contact channel for framework registrations and pre-qualification questionnaires.
For the three awarded frameworks (Cappagh infrastructure, Bridges Electrical and Integrated Water Services MEICA), Tier 1 positions are filled — but each framework holder requires specialist Tier 2 subcontractors across M&E, civils, smart metering installation, commissioning and OT/IT. For the Havant Thicket Reservoir, standalone sub-contracts are ongoing and will continue through to 2029.
🔒 Portsmouth Water supplier portal registration guide, Havant Thicket procurement tracker and tender alert setup — included in Water Industry Hub membership
Unlock Portal Access →
Water Industry Hub monitors all Portsmouth Water procurement channels and delivers relevant notices directly to your inbox — including Havant Thicket sub-contracts and direct Portsmouth Water procurement.
Supply Chain Route Map
Portsmouth Water's AMP8 programme has three main supply chain entry points: (1) the Cappagh infrastructure framework for civil and metering works — approach Cappagh directly for Tier 2 subcontract opportunities; (2) the Bridges Electrical/Integrated Water Services MEICA framework for above-ground M&E — approach either framework holder for electrical, instrumentation and SCADA subcontract work; (3) the Havant Thicket Reservoir standalone procurement — watch Find a Tender for earthworks, lining, civil and M&E packages as they are released through to 2029.
Need Help Getting Into This Supply Chain?
Water Industry Hub offers procurement support from someone who spent 18 years inside a major water company — across distribution, operations, capital delivery and group transformation. Every bid review is carried out personally by the founder. Initial conversation free of charge.
Track Portsmouth Water Tenders and Contract Awards
Water Industry Hub monitors Find a Tender and the wider sector for every Portsmouth Water contract award, live tender and pipeline notice — including Havant Thicket packages — with named supplier details, supply chain analysis and framework watch list.
See Silver Package →
Related Resources
Who Supplies My Water? Postcode Checker Using Official Supply Boundaries →
Capacity check at Portsmouth Water: fee and how to apply →
How to Get on a Water Company Framework — Complete Guide 2026 →