Pipeline installation and rehabilitation is central to AMP8. Ofwat has set binding leakage reduction targets for every water company — requiring a combination of active leakage detection, pressure management and mains renewal. In parallel, wastewater network upgrades for storm overflow compliance are driving significant sewer rehabilitation activity. Trenchless methods — CIPP lining, pipe bursting, directional drilling and microtunnelling — are preferred wherever excavation risk, traffic management cost or environmental sensitivity makes open-cut impractical.
🔵 Pipeline Installation & Mains Renewal
🔧 CIPP Lining & Pipe Rehabilitation
⛏️ Directional Drilling & Microtunnelling
Track Pipeline Tenders and Trenchless Framework Lots
Water Industry Hub monitors every pipeline and trenchless technology tender across all 17 UK water operators — with named Tier 1 contacts and supply chain analysis.
See Silver Package → Browse Directory →